View Single Post
Old 02-05-2008, 11:26 PM   #8 (permalink)
Coyote X
nut
 
Coyote X's Avatar
 
Join Date: Dec 2007
Location: Southen West Virginia
Posts: 621

Metro XFi - '93 Metro XFi Convertible
90 day: 62.17 mpg (US)

DR650SE - '07 DR650SE
90 day: 55.26 mpg (US)

Moonbeam - '94 Astro Conversion
90 day: 22.31 mpg (US)
Thanks: 0
Thanked 8 Times in 7 Posts
Send a message via ICQ to Coyote X Send a message via AIM to Coyote X Send a message via MSN to Coyote X Send a message via Yahoo to Coyote X Send a message via Skype™ to Coyote X
87 amps would not be that hard but 750 amps would take some really big wires I thought most electric cars had stuff like 4ga wires going to the motor. With that many amps it would need something like 00ga.

Ill have to look around and see what I could do to make a fet bank that can handle 750 amps. That would be probably big and a pain to build for a normal hobby type of thing though.
__________________

My Convertible Metro XFI Plug in Hybrid Project build log
  Reply With Quote