View Single Post
Old 04-29-2018, 10:02 PM   #3209 (permalink)
thingstodo
Master EcoModder
 
Join Date: Sep 2010
Location: Saskatoon, canada
Posts: 1,488

Ford Prefect - '18 Ford F150 XLT XTR

Tess - '22 Tesla Y LR
Thanks: 749
Thanked 565 Times in 447 Posts
Quote:
Originally Posted by 02BMW02 View Post
Hi Paul,

Just a thought, would it be possible to connect your Ac controller directly in the leafs invertor system, this would save building the power stage which the invertor already has built into it.

Do you think in the future you will design drop in board in to the existing leaf invertor....I hope you will ;-)
That would also be interesting for me.

I have a couple of the AC controller boards that are waiting to be transplanted into older industrial Variabel Frequency Drives, as the new brains. That may work for the Leaf inverter as well .. not sure. But I don't have a leaf to play with, so I won't be finding out anytime soon.

I'll post about the brain transplants into the industrial VFDs when I get any progress to report.
__________________
In THEORY there is no difference between Theory and Practice
In PRACTICE there IS!
  Reply With Quote