View Single Post
Old 05-01-2019, 02:12 PM   #5 (permalink)
aerohead
Master EcoModder
 
aerohead's Avatar
 
Join Date: Jan 2008
Location: Sanger,Texas,U.S.A.
Posts: 15,883
Thanks: 23,957
Thanked 7,219 Times in 4,646 Posts
CFD results

Independent verification in a full-scale wind tunnel would be prudent.It would cost them less than $500 at the A2 tunnel for the full kit.
If they'd provided the data cloud to Tesla,and Tesla achieved the same results it would lesson suspicion.
Had they developed their hardware in a tunnel,they'd be out a minimum of $429,000,according to their 143-hours/iterations reported.That doesn't include envelope digitizing,autocad/cam,prototyping,transportation,perhaps one master clay modeller,additional manpower,equipment,travel expenses,lodgings,per diem,etc..
__________________
Photobucket album: http://s1271.photobucket.com/albums/jj622/aerohead2/
  Reply With Quote