View Single Post
Old 03-05-2008, 11:22 AM   #6 (permalink)
metroschultz
Master EcoModder
 
metroschultz's Avatar
 
Join Date: Dec 2007
Location: Norfolk, Va. USA
Posts: 869

CPT SLO - '93 GEO Metro plainjane
90 day: 53.91 mpg (US)

SilverHairBeauty - '01 Toyota Avalon XL
90 day: 24.06 mpg (US)
Thanks: 14
Thanked 33 Times in 28 Posts
Send a message via AIM to metroschultz
Smile Thank You

Good suggestions all.
Thanx
BoxChains link led me to the Archimedes Method which I believe is what I vaguely remember from some classroom in the seventies.
TomO, that is the method I was planning on using. Trial and error.
Measure, mark, rinse, repeat.
LostCause if that is true then that will work.
I am trying to make three holes around the perimeter of the new wheel covers.
I want them as close to perfect as possible.
So.
I can transfer wheel to wheel without always having to line up the holes.
Well off to the races.
Thanx Again,
S.
__________________


When you are courting a nice girl an hour seems like a second. When you sit on a red-hot cinder a second seems like an hour. That's relativity.
Albert Einstein
  Reply With Quote