Work work work
Most of the floor harness is done, as is some of the work on half of the dash harness. So, hopefully the wiring is nearly done.
Other than that, I broke out the new angle grinder to grind a bigger how to drop the shifter in. The issue with this shifter is that it sits above the floor rather than below, so the crx has too high of a floor. Hopefully cutting it out so the bottom drops through will fix the issues so that the center console will fit over...who knows though. Grinding was fun. Don't forget your safety goggles!
Tomorrow I'll pull the engine, grind a lot more stuff out, and try to finish up the wiring so I can put power through it.
Pictures: