View Single Post
Old 12-04-2009, 03:11 AM   #3 (permalink)
winker
EcoModding Lurker
 
Join Date: Nov 2009
Location: UK
Posts: 18
Thanks: 0
Thanked 2 Times in 2 Posts
Sorry, I was not trying to "pull the fire alarm", I was just trying to show that they are not offering the protection that is implied.

Quote dcb "They are doing something"... What are they doing?

Quote dcb "and I've been using 50k for a long time"..Why, when the schematic on wiki shows 100K?

Just to be clear, I have not come on here to bash the project. I think its great, and have built a prototype, only to find I have the dreaded Peak and Hold injector. I am trying to work on a solution, probably involve voltage comparator and diode to hold refernce 0.6-0.7 below supply. This would still give two pulses per injector cycle, but could use the injector delay value to ignore the induced pulse at the peak to hold transition.

Last edited by winker; 12-04-2009 at 03:17 AM.. Reason: Felt I needed to justify my position.
  Reply With Quote