View Single Post
Old 12-05-2009, 01:53 PM   #3 (permalink)
dcb
needs more cowbell
 
dcb's Avatar
 
Join Date: Feb 2008
Location: ÿ
Posts: 5,038

pimp mobile - '81 suzuki gs 250 t
90 day: 96.29 mpg (US)

schnitzel - '01 Volkswagen Golf TDI
90 day: 53.56 mpg (US)
Thanks: 158
Thanked 269 Times in 212 Posts
typically nimh bench chargers use peak detection, i.e. the charging system stops charging for a sec and sees if the voltage is still going up from the last time it checked, if I understand it right (probably not). They also may be connected to thermal probes in the pack to be on the lookout for thermal runaway.

I am not sure how you get the battery to play an active role in the operation of a vehicle with an ICE with this arrangement.

If you have a kick starter, I might suggest removing the battery alltogether and seeing if the bike runs well with a large capacitor in it's place.

But for a potential EVer, that info above is quite useful.
__________________
WINDMILLS DO NOT WORK THAT WAY!!!

Last edited by dcb; 12-05-2009 at 01:59 PM..
  Reply With Quote