View Single Post
Old 05-12-2010, 12:00 PM   #3391 (permalink)
amazuki
EcoModding Lurker
 
Join Date: Aug 2008
Location: perlis
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
thanks ian, I have visited the site. For the control board, power board, casing and hardware#1 they added to A$1000 multiply by xchange rate of 2.87 becomes M$2870. I am afraid I cannot afford it for now. Got to start saving right away.

  Reply With Quote