BP Sought To Ease Canadian Rule For Relief Wells
BP Sought To Ease Canadian Rule For Relief Wells : NPR
Quote:
Energy giant BP told Canadian regulators in March that relief wells are an "after-the-fact tactic" in controlling oil well blowouts, less than a month before the catastrophic oil spill in the Gulf of Mexico that the company hopes to stop by drilling two relief wells.
A relief well is the oil industry's gold standard for killing a blowout. In the Gulf, BP's drillers are guiding the two wells to intersect the 7-inch well pipe of the uncontrolled well; the pipe could then be plugged with cement.
|
Quote:
But the first rig wasn't able to set its drill bit into the mud until 13 days after the April 20 blowout on the Deepwater Horizon; the second rig, 28 days after the accident. French said it would take an additional 90 to 120 days to reach the damaged well pipe.
|
Quote:
Instead, BP emphasized preventive technology and practices, many of which have now been called into question due to the catastrophe in the Gulf.
Most notably, the company said it has a "rigid policy requirement," calling for two barriers to hold down the surging oil and gas in a well: heavy drilling mud in the pipe and a blowout preventer at the wellhead.
The drilling mud was intentionally removed on the Deepwater Horizon rig before a cement plug was installed. The blowout preventer then failed.
|
|
|
|