View Single Post
Old 08-20-2010, 10:09 PM   #6 (permalink)
autoteach
Master EcoModder
 
Join Date: Apr 2010
Location: belgium, wi
Posts: 262

Bus - '94 Ford School Bus huge

Stupid - '01 Chevy Blazer LS
90 day: 21.38 mpg (US)

hawk - '00 Honda Superhawk
Thanks: 2
Thanked 24 Times in 19 Posts
consider using a plate above the joists and running threaded rod to that. It may cost more, but I am sure that your safety factor will be raised. The other thing to remember is the tensile vs shear. Use lags in shear if possible. I have had boards splinter off the portion that I was screwed into without pulling the threads out. Running threaded rod to a piece of 2x10 laying flat across the joists with fender washers distributing the load on the wood would be significantly safer (IMHO, although I am sure that it could be proven).
  Reply With Quote