View Single Post
Old 11-21-2010, 01:45 AM   #4025 (permalink)
DJBecker
EcoModding Apprentice
 
Join Date: Nov 2010
Location: Annapolis
Posts: 159
Thanks: 0
Thanked 32 Times in 27 Posts
Quote:
Originally Posted by MPaulHolmes View Post
EDIT: Oh ya, the boards will be here in maybe 15 days or something. 12 days to manufacture them, and then super fast international shipping.
Which boards are you talking about? Another round of the control board, a new design for the control board, or something else entirely? And how much will they cost?

Congrats on the pinewood derby win. I have fond memories of winning those when I was a cub scout. The only help I needed was pouring the lead and turning down the wheels on a drill.
  Reply With Quote