View Single Post
Old 04-28-2008, 12:29 AM   #126 (permalink)
Coyote X
nut
 
Coyote X's Avatar
 
Join Date: Dec 2007
Location: Southen West Virginia
Posts: 654

Metro XFi - '93 Geo Metro XFi Convertible
90 day: 62.17 mpg (US)

DR650SE - '07 Suzuki DR650SE
90 day: 55.26 mpg (US)
Thanks: 0
Thanked 37 Times in 26 Posts
Send a message via MSN to Coyote X
More stuff done. This detail stuff isn't quite as much fun as welding a car together

here is my heater box that has been cut up and made as compact as possible. A chainsaw is way faster to cut it up with than a dremel. Took me 15 minutes to cut a section of the box away with the dremel. Probably 1 minute to finish it up with a chainsaw.


And here is what the dash is more or less going to look like in the car.



I have all the holes and seams glued up. I have a few minor things to do like cut the holes for the parking brake cables and the shifter then the interior should be ready to assemble. The front end is ready to do the final assembly on. I just need to make the back inner fenders and the exhaust and it will soon be on the road.
__________________


  Reply With Quote