View Single Post
Old 04-30-2008, 01:01 PM   #13 (permalink)
cwarnar
Loving my blueberry
 
cwarnar's Avatar
 
Join Date: Mar 2008
Location: Montmartre, SK
Posts: 42

Altimax - '98 Nissan Altima GXE
90 day: 32.88 mpg (US)

The Wan - '07 Toyota Sienna CE
90 day: 22.81 mpg (US)
Thanks: 0
Thanked 0 Times in 0 Posts
Quote:
Originally Posted by dremd View Post
subscribed:

Could anyone point me to info regarding the transfer in to the ground?

Is there a well, a pit with pipes, something else?

Considering options here.
The 2 main ground loops are horizontal (trenching), most rural areas can use this due to the extra amount of space required, plus offers some cost savings. The other is vertical (Drilling), this is for confined spaces and soil not suited for trenching.

More info here:

http://www.groundloop.com/geothermal.htm
__________________
  Reply With Quote