I cut the dam off two inches in height got it all fastened down with screws in the dam part and heavy plastic ties (rated at 175 lbs) for the belly pan part. Still need to add the chin. I used a sawsall and a small sabre saw to do all the cutting. A step bit worked really well for drilling the holes. So the pan bows down about 3 inches as it passes under the front diff and bows back up about the same distance once behind the diff. Should I have kept it at the same level after the diff?
|