View Single Post
Old 09-09-2011, 12:46 PM   #102 (permalink)
orbywan
EcoModding Apprentice
 
Join Date: Jul 2010
Location: Tucson, AZ
Posts: 245
Thanks: 111
Thanked 163 Times in 63 Posts
Quote:
Originally Posted by Sven7 View Post
Wow, cool project. I'm tempted to put some belly pans on my own Twin I Beam now!

One question: what did you bolt the belly pans to?
The answer to that question is anything you can find or fabricate. The frame, sub-frames, the coach body at the underneath edges, cross-members, and mostly brackets that you fabricate along the way.

The most surprising part of the process is that 5/16 hex head self-tappers went through the frame and sub-frames faster and easier than any drill bit I tried, and I tried several, hardened, titanium, etc., all new. They don't exactly go through it like butter, but I was surprised at how well they did go through it. The sharpest and fastest to go through by far were made by L.H. Dottie company in Commerce California, someone left a whole assortment of them in my shop, but even the Hillman screws at the local ACE hardware did a good job.
  Reply With Quote