Heres the latest:
Got the frame about half done. Get the hinge material in the morning and should have the rest of it tacked up by tomorrow evening. I think i'm going to add a little more incline to the bottom to get it closer to the 10* point. I am currently at about 4. Downloaded angle meter app and it is suprisingly super accurate.
Timing belt is back on and engine buttoned up and now just waiting on one more water inlet to have everything under the hood complete.
To Do List:
-Finish carrier
*Finish carrier inner structure.
*Make latch for carrier
*Paint carrier frame
*Skin Carrier and add shelving
*Install ail lights
-Install Front Bumper Rubber Air Dam
-Bend up top air foil
-Fabricate wheel well covers
-Fabricate wheel covers
-Remove mud flaps
-Run power wire and install 2000w Inverter
-Make shelving in bed