haha ya. I'm a bit of a scatterbrain. That's how I ended up with a 1.2 GPA in high school. I only have space to set up one thing at a time, and the solar charger/pure sine wave inverter are by far the easiest to get working. So, I figured that since the 3 phase controller will blow up several sets of igbts until it's working, I figured it's best to get the other stuff working first, since each controller type is doing double duty.
|