View Single Post
Old 09-21-2012, 11:07 AM   #5 (permalink)
MPaulHolmes
PaulH
 
MPaulHolmes's Avatar
 
Join Date: Feb 2008
Location: Maricopa, AZ (sort of. Actually outside of town)
Posts: 3,832

Michael's Electric Beetle - '71 Volkswagen Superbeetle 500000
Thanks: 1,362
Thanked 1,202 Times in 765 Posts
haha ya. I'm a bit of a scatterbrain. That's how I ended up with a 1.2 GPA in high school. I only have space to set up one thing at a time, and the solar charger/pure sine wave inverter are by far the easiest to get working. So, I figured that since the 3 phase controller will blow up several sets of igbts until it's working, I figured it's best to get the other stuff working first, since each controller type is doing double duty.
__________________
kits and boards
  Reply With Quote