View Single Post
Old 11-17-2012, 03:20 PM   #7 (permalink)
watahyahknow
EcoModding Lurker
 
Join Date: Jul 2009
Location: netherlands europe
Posts: 16
Thanks: 0
Thanked 0 Times in 0 Posts
Quote:
Originally Posted by MPaulHolmes View Post
haha. Yes, I figured out the problem too! At least I think I figured it out. Next attempt to be completed in the next couple weeks. And if that blows up, I've got another idea, and if that blows up I'll start crying.
i seen the buildmanual online for the "smaller" version of the controller , im wondering if you cant just put longer buslines on it and connect two of those kits in series with one controllerboard
from wat i understand each bank switches a small amount of the power on and off at increasing speed to ranp up the power to the motor so doubling up on the amount of switches should double up the powerrating too as long as the copper buslines can take it
  Reply With Quote