Tonight I had a bit of time to put some more things together. I got the clutch slave cylinder installed, the linkages to the shifter bolted in and cleaned a few things up.
I need to pickup some tubing insulation for my heater and locate the wire for the tachometer. Then I can put the controls back in!
I also have to insulate the battery pack since it still gets cold and the jury is still out on if the CALBs can be charged under 32F with C/10 charging current.
|