View Single Post
Old 03-02-2013, 07:33 PM   #85 (permalink)
capturedbyrobots
EcoModding Lurker
 
Join Date: Aug 2012
Location: El Cerrito, CA
Posts: 77
Thanks: 3
Thanked 10 Times in 4 Posts
As to money and time to this project, looking to spend somewhere around nothing, give or take. Spent about $40 on the new sleeper for the flashing and caulk. Everything else I had on hand.

Time? Don't know. I could do all the air dams in a day. Boat tail might take a day or 2.
Got some free coroplast coming my way, but might have to buy a full sheet or 2.
A full sheet is around $30 from my local "tap plastics".
A full sheet will do the side air dams 1 ft x 16ft. I have the front coroplast already.
  Reply With Quote