It will be interesting to see what ou come up with. This was my first attempt at a mock-up, working with that external drip rail.
What I'm working with now are 16ft long redwood strips that go from the stagnation point to the rear in one sweep (on a different Beetle). I've learned some interesting things, but I don't have a camera right now.