well PF is a factor (hyuk), the correcting needs to be near the source to not affect the grid. And I don't know that a properly designed inverter is going to deviate from PF=1 much (I mean what's the point of designing a "faulty" inverter)? I think folks are going to have to get creative with how to use excess peak power, or minimize it somehow.
|