View Single Post
Old 01-04-2014, 01:34 AM   #295 (permalink)
niky
Master EcoModder
 
Join Date: Aug 2010
Location: Philippines
Posts: 2,173
Thanks: 1,739
Thanked 589 Times in 401 Posts
250k a year, especially if you're assembling frames from bent tubes instead of stamping them out of machines, will require more than a single factory.
  Reply With Quote