We have an easy going building department, last I checked. I'm going to keep it basic: 2x4 walls and I'll work out the ceiling and rafters in the section drawing. Probably CMU frost wall (similar to existing) and a slab, or possibly pavers for the floor. Long ago I dug a tranche and put in two conduits (3/4" and 1/2") with the intention of putting in a power circuit and a telephone/data wire. If I put some solar PV panels out there, I may need a second power circuit.
I'll have to check if I can also fit the Saab 900 in there (with the CNC and the work table(s) pushed to the corners). If it needs a little more room to get that in there, better change the plan!
I hope to eventually insulate it, and be able to extend the work year and the fiberglass 'season'. And the bicycles and yard tools etc. need to be stored, too.
|