07-04-2014, 03:57 PM
|
#27 (permalink)
|
Furry Furfag
Join Date: Nov 2013
Location: Apple Valley
Posts: 2,084
Thanks: 67
Thanked 409 Times in 313 Posts
|
Quote:
Originally Posted by UltArc
I'd just let the car charge it when you get there until lunch, then go out and unplug it and turn your engine over. 4 hour charge, then you'll have another when you go to sleep. But I would just buy an extra large capacity battery for it in the first place, and use that.
As much as I like going out of my way to do something clever and interesting, there is a time one must think about the cost and energy of trying to do it another way. Like when I wanted to repurposed an Insight battery. Yes, I COULD have done it- but it wasn't reasonable. For the energy, risk and money it would take, I could just get other batteries, save time, money, and not risk my life. Your situation is different, but the principle is the same.
|
I don't get a lunch break where I work :P.
__________________
|
|
|