Thanks Man!!!
My goal now is to have it running by the end of November.
My to do list as of now.
Sand and Buff out rear tail lights and install.
Install front and rear bumpers.
Install side moldings.
Cut 3 1/2" hole in rear quarter molding and install exhaust bezel for side out exhaust.
Finish building scatter shield turbo box and mount LP turbo behind rear seat.
Install deep cell trunk mount battery.
Wire in on/off switch from deep cell battery to Tilton pump.
Wire in emergency main battery switch to Tilton pump.
Install charging plug in rear between tail lights.
Build 1 1/2" dia. exhaust with muffler loop.
Run cold side charge pipe outlet from LP turbo and attach to inlet of HP turbo.
Install Tilton pump and run return oil line from mid-mount LP turbo to pump and then to oil pan.
Run oil feed line to LP turbo.
Install radiator and hoses.
Install battery tray and battery.
Install 4 bar map sensor that reads exhaust back pressure and data loggs.
Install EGR control's.
Finish hot air injection valve and plumbing.
Install new wheels and tires.
I hope I can get it done this year lol