View Single Post
Old 10-20-2014, 04:08 AM   #8 (permalink)
nickec
EcoModding Lurker
 
Join Date: Feb 2010
Location: 770003/48092/90036
Posts: 43
Thanks: 21
Thanked 5 Times in 4 Posts


Trial fairing to determine sizing and ergonomics.

"J" shaped 1/2" EMT (conduit) pierces wooden block.

Forward portion is two layers of corrugated cardboard. Rear portion is coroplast.

EPP pipe insulation serves as temporary combing. Zip ties fasten panels to EMT. Rearmost end of EMT bolted to frame near tailights.

Primitive yet effective. More panels to come.

Unlike in earlier pictures, tailight is not inverted.
Attached Thumbnails
Click image for larger version

Name:	IMAG0315.jpg
Views:	524
Size:	74.0 KB
ID:	16171  
  Reply With Quote