if there was only a way to get energy from the ground and ship it to other countries or pump it across multiple countries in a big pipeline?
There is, the Atlantic Superconnection carrying 1.2 Gigawatts of geothermally generated electricity from Iceland to the UK:


Facts
•Cable length - 1000km
• World’s longest subsea HVDC cable
•Total capacity - 1.2 Gigawatts
•Homes supplied -Two million

Atlantic Superconnection