Work done:
Plugs
Thermostat
4 struts
4 tires
cleaned IAC valve
tightened-repositioned AT cooler hose clamps
tightened valve cover
wiper blades
hot air duct
painted wiper arms
installed trailer hitch and wiring
replaced heater blower switch
cleaned engine compartment
cleaned passenger compartment
adjusted all latches
bumped trunk weatherstrip up for better seal
ripped off disintegrating window seals and filled gap with silicone
checked brakes all around
replaced steering rack boots
regards
mech
|