View Single Post
Old 02-16-2015, 12:58 AM   #1707 (permalink)
thingstodo
Master EcoModder
 
Join Date: Sep 2010
Location: Saskatoon, canada
Posts: 1,488

Ford Prefect - '18 Ford F150 XLT XTR

Tess - '22 Tesla Y LR
Thanks: 749
Thanked 565 Times in 447 Posts
Quote:
Originally Posted by thingstodo View Post
I've been busy with other things - should be able to power it up on Sunday, but first I need to:
- get the contactors connected
- get a 48V battery pack and precharge resistor connected
- get my test 5 HP motor connected
- make a bushing to fit my encoder to the motor shaft
- get it all connected up
Most of it is in the basement now. Pictures are:
- Contactors, precharge resistor, 80 amp 125VDC breaker, on the high voltage side of the controller
- 5 HP 3 phase 208V motor, encoder without adapter/bushing to mount encoder on the motor shaft (:
- motor leads sitting inside U, V, and W from the controller
- 48V gel cell battery pack .. that *MAY* supply 20 amps for a few seconds
- low voltage side of the controller with connectors

Still to bring in - 12V lithium battery, throttle, slide switch to enable controller

Still to read - where to connect the throttle, where to connect the 'ignition' switch

Still to fab - encoder mount for motor shaft
Attached Thumbnails
Click image for larger version

Name:	IMAG2306a contactors.jpg
Views:	88
Size:	74.6 KB
ID:	17028   Click image for larger version

Name:	IMAG2307a motor.jpg
Views:	84
Size:	51.6 KB
ID:	17029   Click image for larger version

Name:	IMAG2308a 3 phase.jpg
Views:	72
Size:	63.1 KB
ID:	17030   Click image for larger version

Name:	IMAG2309a battery.jpg
Views:	77
Size:	53.0 KB
ID:	17031   Click image for larger version

Name:	IMAG2310a connectors.jpg
Views:	67
Size:	63.5 KB
ID:	17032  

  Reply With Quote
The Following User Says Thank You to thingstodo For This Useful Post:
MPaulHolmes (02-16-2015)