View Single Post
Old 07-05-2015, 02:38 PM   #34 (permalink)
sheepdog 44
.
 
Join Date: Dec 2011
Location: Salt Lake valley Utah
Posts: 923
Thanks: 114
Thanked 397 Times in 224 Posts
Ecm enabler is installed and ready to be programmed. Pic programmer recognizes the pic. Just have to find suitable 12volt power and ground lines from the MCM harness, and download Peters code into it.



Quick note: All 3 MOTSTB should be connected together in the diagram in the previous posts on page 3.

If successful, this would delete both BCM and MCM computers, and IMA battery. My one worry for the time being, is if the 12volt battery will charge properly. From my understanding the MCM is integral to running the MDM which feeds power into the DC-DC which charges the 12volt. All current IMA bypasses have so far left the MCM connected.
__________________
I try to be helpful. I'm not an expert.
  Reply With Quote
The Following User Says Thank You to sheepdog 44 For This Useful Post:
ME_Andy (07-05-2015)