View Single Post
Old 07-06-2015, 02:57 PM   #12 (permalink)
freebeard
Master EcoModder
 
freebeard's Avatar
 
Join Date: Aug 2012
Location: northwest of normal
Posts: 27,700
Thanks: 7,777
Thanked 8,585 Times in 7,069 Posts
Quote:
Suppose the charging stations need to charge 120 cars per hour.
They'd be able to do that with 8 4-minute chargers, or 120 1-hour chargers.
They'd draw the same power from the grid, but the charge station infrastructure needed for the first setup would be much less.
I think there is more to it. The grid is AC while the charging is DC, so 8 inverters or 120? And one of the proposed uses for the Gigafactory is to add battery banks to the nodes on the Tesla Supercharger network.
  Reply With Quote