Time for a to do list update.
My plans this winter.
1) Build a permanent box frame in closer for the large mid-mount turbo to set in.
The one I have now is just a temporary to let me see what improvements should be made.
2) Build a internal large turbo to small turbo charge pipe that will run inside the car and through the fire wall. This will give me back some ground clearance.
3) Build a 8 point roll bar that will have head clearance for daily driving without a helmet issues.
4) Install vacuum pump.
5) Install N2O dry system.
6) New rear Calipers and pads.
7) New spark plugs and wires.
All of this will happen while I keep the car on the road except the roll cage. This will have about a two week down time.
__________________
Pressure Gradient Force
The Positive Side of the Number Line
|