Oh I had been thinking of it as "the black box of the 3 phase part" was sucking a constant 100 amps from the capacitor bank (I wasn't thinking about phase current) at a voltage V. So, I would have to provide 200 amps on the input side at 1/2 the voltage. So, I have 2 high side and 2 low side switches for the bidirectional boost, figuring that my goal was to just turn 150v at 200amp in batteries into 300v at the capacitor bank at 100amp into the 3 phase part.
|