Thread
:
The Firebrid Hybrid Convertible Project (Prius platform swap)
View Single Post
06-03-2016, 04:23 PM
#
201
(
permalink
)
Bill the Engineer
Master EcoModder
Join Date: Dec 2013
Location: Lower Slower Delaware
Posts: 462
Thanks: 430
Thanked 866 Times in 348 Posts
New electrical service installed today for the air compressor and MIG welder, plus new 30amp 120V lines for other power tools. Now things can get rolling on the project!
Bill the Engineer
Bill the Engineer
View Public Profile
Send a private message to Bill the Engineer
Find More Posts by Bill the Engineer