View Single Post
Old 12-15-2016, 12:11 PM   #10 (permalink)
botsapper
PSmodder lurker
 
Join Date: Jan 2009
Location: Chino
Posts: 1,605
Thanks: 26
Thanked 908 Times in 522 Posts
NRG EVgo, the largest US public DC charging network will be installing the first 350 kW charging station in Baker, CA. The Baker terminal is perfectly located, in the middle of the Mojave Desert at the junction of Interstate 15 and Death Valley Road. A well-known midway resting/eating/fueling point strategically located between Los Angeles and Las Vegas. Those gambling/weekend vacationers in their EVs could get quickly charged up while they finish their gyros at the Mad Greek or have more jalapeno poppers at the Jack in the Box.
The Baker EVgo station will have BOTH charging protocols, CHAdeMO and CCS connectors.

EVgo Installing First 350 kW Ultra Fast Public Charging Station In The US
  Reply With Quote
The Following 2 Users Say Thank You to botsapper For This Useful Post:
aerohead (03-09-2019), Xist (01-08-2017)