View Single Post
Old 12-15-2016, 01:11 PM   #14 (permalink)
jamesqf
Master EcoModder
 
Join Date: Jun 2008
Location: Earth
Posts: 5,209
Thanks: 225
Thanked 811 Times in 594 Posts
Quote:
Originally Posted by thingstodo View Post
...there is a power bill penalty for loads that go from 0 (no charging) to 350 kw (charging) in a minute or two ... or perhaps occasionally to 3.5 MW (10 chargers at 350 KW in one location).
Don't know about power bills. That depends on whether the power company is able to pass on the cost to the owners of the chargers, or has to spread it out over the whole customer base.

The real problem is the technical one of system stability. Simplistically, everything in a power has to run at the same frequency (60 Hz in the US). The grid has inertia, both in the rotating mass of generators and the electrical equivalent, but this has limits. Suddenly dumping too much of a load at one point of the grid can drag down its frequency, causing it to destabilize and disconnect from the rest of the grid. Worst case, the instability can propagate, bringing down the whole grid.

Seems like a good way to deal with this would be to use flywheel storage, since that has built-in inertia, and doesn't need inverters to go from DC to AC, like batteries or capacitors.
  Reply With Quote
The Following User Says Thank You to jamesqf For This Useful Post:
aerohead (03-09-2019)