View Single Post
Old 06-03-2017, 10:46 PM   #44 (permalink)
sendler
Master EcoModder
 
sendler's Avatar
 
Join Date: May 2011
Location: Syracuse, NY USA
Posts: 2,935

Honda CBR250R FI Single - '11 Honda CBR250R
90 day: 105.14 mpg (US)

2001 Honda Insight stick - '01 Honda Insight manual
90 day: 60.68 mpg (US)

2009 Honda Fit auto - '09 Honda Fit Auto
90 day: 38.51 mpg (US)

PCX153 - '13 Honda PCX150
90 day: 104.48 mpg (US)

2015 Yamaha R3 - '15 Yamaha R3
90 day: 80.94 mpg (US)

Ninja650 - '19 Kawasaki Ninja 650
90 day: 72.57 mpg (US)
Thanks: 326
Thanked 1,315 Times in 968 Posts
And now I see that there is alot of misinformation about cost. If the two new AP1000 nuclear plants outside Atlanta really come in at $7B each they will be 1/4 the cost of grid scale photovoltaic plus storage. And consume 1/25 the space. And be much more versatile and reliable. And don't have to be located in the desert.
 
The Following User Says Thank You to sendler For This Useful Post:
Xist (06-11-2017)