Quote:
Originally Posted by oil pan 4
IDoes the 2011 and 2012 leaf fast charge package charge faster than 3.3kw through the j1772?
Because I'm searching around on the Internet and the 3.3kw limit for the j1772 on 2011 and 2012 leaf seems to be the consensus?
Because if this thing will charge at 6.6kw I will buy one tonight.
|
Not unless modified, all 2011 and 2012 Leafs charge the same off the J1772 port, regardless of CHAdeMO charge package or not.
But 3.8kW does sound right. The "3kW" or "3.3kW" charger pulls 80% of 20A, that is, 16A. 16A x 240V = 3.8kW.
Try finding a "6kW" charging station and see what happens.