Quote:
Originally Posted by modified metro
If the variables at the bottom of the speadsheet is changed, shouldn't the CD and CRR numbers change also?
|
Since you're testing on a different day,the only way that you could isolate a difference,is to do back-to-back coastdowns,with and without the mods,so you'd always have a baseline reference from the same day/conditions to compare to.
You could have a dozen unaccounted for variables,any one of,which could affect your coastdown times.It would be impossible to sort it out.