I saw 7 clients, worked with my brother, installed the brackets, cleaned, primed, and painted the braces, but did not install them or the coroplast.
Uh guys?
I installed the studs 20" OC.
That was a mistake.
I am thinking that I will wrap the greenhouse sideways. Otherwise each sheet would be attached to 2 studs, but unless I trim each and every sheet, they wouldn't join on a stud, and I am positive those joints would flex out.
I could install fire breaks, but would one line be adequate?
Installing them sideways would halve the floating joints, but then I would have a horizontal seam 4' up.
Fire break?!
I always see fire breaks offset, which would be easier, but then I would only be able to screw one panel to each fire break.
Do I need H-channels where the panels join on a seam?
Isn't that why we have caulk?!