I saw 7 clients, worked with my brother, installed the brackets, cleaned, primed, and painted the braces, but did not install them or the coroplast.

Uh guys?

I installed the studs 20" OC.

That was a mistake.

I am thinking that I will wrap the greenhouse sideways. Otherwise each sheet would be attached to 2 studs, but unless I trim each and every sheet, they wouldn't join on a stud, and I am positive those joints would flex out.

I could install fire breaks, but would one line be adequate?

Installing them sideways would halve the floating joints, but then I would have a horizontal seam 4' up.

Fire break?!

I always see fire breaks offset, which would be easier, but then I would only be able to screw one panel to each fire break.

Do I need H-channels where the panels join on a seam?

Isn't that why we have caulk?!