[2 Weeks Away] New Maxton Design Air Dam/Splitter gets Installed
We're finally getting that front splitter installed on the van in 2 weeks. having to drive 10+ hours or more to my buddys shop in Goldsboro. He specializes in body kits and when I sent him the hardware for the splitter, he told me that hardware isn't good enough. So before drilling etc, we're heading over to a place he knows that has all the hardware we need to do the job. Not only hardware but we'll be panel bonding the splitter also. We've taken time a hotel for some benge food network xmas shows so that we don't drive around while the glue is curing. While there, I'll speak with him about things we can do for side skirts..
Last edited by LostinTransit; 12-05-2024 at 03:29 PM..
|