The track date and time has been secured and we get 1 hour on the track and can video/still photo our adventure.. the wife and I will take turns doing this. The only drawback.. if it rains or snows.. but even then the wife said she will drive the van on the wet and snowy pavement.
This isn't about just driving the van around a track, it's about test the new front splitter and the rear coil springs. later more items like camber plates and side skirts will be added and again we'll head out to the track for more testing. One I can say right now without even stepping on the track is that the front springs will have to get the same treatment as the rear, Shorter and stiffer and we'll look into designed this some time in Jan.
Remember those air tab things? well I spoke with someone about this.. meaning he is an engineer and I submitted an idea of something less noticeable that can be placed on the van the same way I was going to place these air tabs.. this may be something big or at least for our van.
Last edited by LostinTransit; Today at 05:13 AM..
|