View Single Post
Old 06-04-2009, 01:06 PM   #43 (permalink)
janvos39
EcoModding Apprentice
 
janvos39's Avatar
 
Join Date: Jan 2009
Location: Belgium
Posts: 159

jvsgears - '14 Skoda Octavia
Team m8
90 day: 52.47 mpg (US)
Thanks: 22
Thanked 38 Times in 28 Posts

Alu housing



Assembly



Center



Outerring


Some suggestions. Take the dimension of the material that will be welded to the center and to the housing larger than on the drawing. After welding some machining is needed to come to the wanted dimensions. In general check the dimensions of your clutch against the dimensions of the drawing not sure all Suzukis are identical and there will be tolerances also.
For the overrunning bearing I suggest to use a loctite to attach to the bore and the housing. This can be undone by heating in case disassembly is needed.
The nut can be made from two nuts by welding a bush inbetween and turn it on the lath.
Between the two bearings a spacer is needed of 1 mm thickness.
I did not check the fit of the plastic cover. Probably a hole needs to made where the longer nut is located.

I hope this is enough to do the modification.

Jan

Last edited by janvos39; 06-04-2009 at 06:31 PM..
  Reply With Quote