View Single Post
Old 01-01-2011, 03:56 PM   #242 (permalink)
Jim-Bob
Junkyard Engineer
 
Jim-Bob's Avatar
 
Join Date: Dec 2010
Location: New Port Richey, Florida
Posts: 167

Super-Metro! - '92 Geo Metro Base

$250 Pizza Delivery Car - '91 Geo Metro Base
Team Metro
90 day: 43.75 mpg (US)

Fronty the wonder truck - '98 Nissan Frontier XE
Thanks: 7
Thanked 19 Times in 12 Posts
I am wondering if I order it if it is possible to get the switches to the front rather than on top. The reason being that I have a way I wish to install it in the dash that requires front mount buttons. I considered getting the kit instead because of this, but I have no way to program the PROM chip if I do. I can't see spending the money on an emulator for what would likely be a one time use. I'd also rather have a blue display so I would likely order it with the screen not soldered so I could change it myself.
__________________
No green technology will ever make a substantive environmental impact until it is economically viable for most people to use it. This must be from a reduction in net cost of the new technology, not an increase in the cost of the old technology through taxation



(Note: the car sees 100% city driving and is EPA rated at 37 mpg city)
  Reply With Quote