View Single Post
Old 02-05-2011, 03:28 AM   #4302 (permalink)
billhac
EcoModding Lurker
 
billhac's Avatar
 
Join Date: Oct 2010
Location: phoenix
Posts: 42

nEon - '96 dodge neon
Thanks: 0
Thanked 3 Times in 2 Posts
im ready when you are once you get it worked out just send me an invoice, in the mean time ill be waiting for the 500 amp power board, so i can get started on it, iv got everything else comming. btw I sent my revolt controller to an aluminum fab shop here to have a nice cover made and see if it can be incorperated as a heat sink when bolted to the base plate, cant wait to get it back to look at it. the cover I made for it really sucked and I was tired of looking at it.
  Reply With Quote