Got the engine out of the Metro today, finally feel like I am making some progress. Also got the wiring harness removed. What a mess that is going to be to get sorted. Everything is removed from the body except the rear suspension. Will probably get that removed tomorrow and then it's time for the saws-all.
After everything is cleaned I am going to start a wooden/PVC pipe mock-up of the frame. That will give me an idea of how much tubing I will need for the roll cage. The cage is going to be built by a local chassis shop.
Last edited by BobM; 12-12-2011 at 09:26 PM..
|