Thread
:
CarBEN EV5 Full Sized Prototype Construction - 5 Seat Electric Car From Scratch
View Single Post
10-15-2012, 07:12 PM
#
100
(
permalink
)
NeilBlanchard
Master EcoModder
Join Date: May 2008
Location: Maynard, MA Eaarth
Posts: 7,907
Mica Blue
- '05 Scion xA RS 2.0
Team Toyota
90 day:
42.48
mpg (US)
Forest
- '15 Nissan Leaf S
Team Nissan
90 day:
156.46
mpg (US)
Number 7
- '15 VW e-Golf SEL
TEAM VW AUDI Group
90 day:
155.81
mpg (US)
Thanks: 3,475
Thanked 2,950 Times in 1,844 Posts
I built my temporary shelter today!
The long scaffolding braces in the foreground are only there to make sure the scaffolding stays up. The ridge and the A-frame legs are H sections made from 16' strapping screwed together, and the eaves are T sections. They are light and relatively strong. The whole shelter was under $100. I need to get stakes to hold the legs of the A-frame down in a wind.
Welcome to my blue world! My 20'x30' tarp is only just big enough...
It would have been a perfect day for gluing today -- it was up in the low 70's, but it was threatening to spit much of the day, so I put up the shelter so I can glue anytime it is above freezing long enough for the glue to dry.
__________________
Sincerely, Neil
http://neilblanchard.blogspot.com/
The Following 2 Users Say Thank You to NeilBlanchard For This Useful Post:
aerohead
(10-19-2012),
Christ
(10-24-2012)
NeilBlanchard
View Public Profile
Send a private message to NeilBlanchard
Find More Posts by NeilBlanchard