started working on the vacuum gauge mount for the a pillar:
Turning scrap ABS tube on lathe to outside diameter of the gauge:
After being Dremeled to fit:
Front of gauge:
(square thing is camera reflection)
Still a work in progress. Still have to figure out how to route the vac line through saturn firewall.