View Single Post
Old 04-17-2014, 05:49 PM   #267 (permalink)
user removed
Master EcoModder
 
Join Date: Sep 2009
Posts: 5,927
Thanks: 877
Thanked 2,024 Times in 1,304 Posts
Welded in 50 tabs today in 4 hours working with #3 brother. Should be enough to hold the floor, sides, engine harness, radiator, and fuel tank in place. I use speed nuts 6MM with phillips head 6 MM screws. That way I can use one screwdriver to remove just about everything. In other places, Ill drill and tap 10-32 holes in the frame and use countersunk flush face hex drive screws.

Sendler, now it's time to paint the frame which I plan on starting tomorrow (Friday) if my back calms down from today. Then the floor panels can go in permanently with the screws and adhesive sealer.

regards
Mech
  Reply With Quote
The Following 2 Users Say Thank You to user removed For This Useful Post:
aerohead (04-19-2014), HHOTDI (05-14-2014)